We study the problem of two-machine no-wait flowshop scheduling with learning effect and convex resource-dependent processing times. Under the condition of the due-date assignment with common flow allowance (i.e. slack (SLK) due-date assignment), we provide a bi-criteria analysis where the first criterion is to minimise the scheduling criteria (i.e. the weighted sum of earliness, tardiness and flow allowance costs), and the second criterion is to minimise the resource consumption cost (i.e. the weighted sum of resource consumption cost). The objective is to determine the optimal job sequence, resource allocations and common (flow allowance) slack time that minimise the three different versions of the two criteria. We prove that these problems can be solved in polynomial time. © 2018, © 2018 Informa UK Limited, trading as Taylor & Francis Group.
Keyword:
Reprint Author's Address:
Email:
Source :
International Journal of Production Research
ISSN: 0020-7543
Year: 2019
Issue: 6
Volume: 57
Page: 1873-1891
4 . 5 7 7
JCR@2019
8 . 5 6 8
JCR@2020
ESI Discipline: ENGINEERING;
ESI HC Threshold:83
JCR Journal Grade:2
CAS Journal Grade:3
Cited Count:
WoS CC Cited Count: 16
SCOPUS Cited Count: 27
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 5
Affiliated Colleges: