• Complex
  • Title
  • Author
  • Keyword
  • Abstract
  • Scholars
Search

Author:

Zhou, Hui-Gao (Zhou, Hui-Gao.) | Xu, Fan (Xu, Fan.) | Jia, Yi-Fan (Jia, Yi-Fan.) | Liu, Pu (Liu, Pu.) | Hu, Zhi-Long (Hu, Zhi-Long.) | Zhang, Wan-Rong (Zhang, Wan-Rong.) | Zhu, Jing (Zhu, Jing.) | Hong, Shen (Hong, Shen.) | Zhang, Chang-Chun (Zhang, Chang-Chun.) | Huang, Xi-Dong (Huang, Xi-Dong.)

Indexed by:

EI Scopus CSCD PKU

Abstract:

With the construction of UHVDC power grid in China, there are many issues worthy of studies. According to the system designs of both Xiangjiaba-Shanghai and Yunnan-Guangdong UHVDC projects, we proposed prospective parameters for operational test for UHVDC thyristor valves, and analyzed and calculated various operating conditions based on the existing HVDC standards. Compared with ±500 kV HVDC projects, the results are helpful to the engineering of establishment of UHVDC operational test circuit.

Keyword:

High voltage direct current Operational test Test circuit Testing parameters Thyristor valves

Author Community:

  • [ 1 ] [Zhou, Hui-Gao;Xu, Fan;Jia, Yi-Fan;Liu, Pu;Hu, Zhi-Long;Zhang, Wan-Rong;Zhu, Jing;Hong, Shen;Zhang, Chang-Chun;Huang, Xi-Dong]Xi'an High Voltage Apparatus Research Institute, Xi'an 710077, China
  • [ 2 ] [Xu, Fan;Jia, Yi-Fan;Hu, Zhi-Long;Zhu, Jing]Xi'an Jiaotong University, Xi'an 710049, China

Reprint Author's Address:

Show more details

Related Keywords:

Source :

Gaodianya Jishu/High Voltage Engineering

ISSN: 1003-6520

Year: 2010

Issue: 1

Volume: 36

Page: 74-80

Cited Count:

WoS CC Cited Count: 0

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 6

Affiliated Colleges:

FAQ| About| Online/Total:684/167029416
Address:XI'AN JIAOTONG UNIVERSITY LIBRARY(No.28, Xianning West Road, Xi'an, Shaanxi Post Code:710049) Contact Us:029-82667865
Copyright:XI'AN JIAOTONG UNIVERSITY LIBRARY Technical Support:Beijing Aegean Software Co., Ltd.